The project encompassed traditional construction methods, trench pour foundations, pre cast concrete floors, cavity walls and trussed roof with a slate finish. In addition to M&E installations and internal finish, we also undertook landscaping to the perimeter of the school
The Site Manager delivered a talk to the children during morning Assembly on the subject of safety. There was no interruption in the teaching timetable.