Case Study

American Airlines: Kerbside Check-in

Construction of a kerbside facility designed to fast track American Airline’s first class passengers. The development was an integral part of the new extension and refurbishment of Terminal 3 Heathrow airport.

The project featured a high specification fit-out of a new steel frame kerbside check-in. Bespoke stainless steel ceilings and service desks with a new baggage conveyor. Leather clad wall and glass feature back wall with integrated fibre optic accent lighting.

GET IN TOUCH
© 2020 Brennan Group, 7 De Grey Square, Colchester, Essex, CO4 5YQ
Designed & Developed by Key Element